Industrial Equipment Relocation and Reconfiguration in Georgia
Move What You Already Own.
Planning a Move?
What We Move
Scope
Reuse or Replace
Reuse
We will tell you when reuse is not worth it. Rack that has been in service for many years and hit a few times can cost more to inspect, repair and re-certify than to replace. The answer depends on the specific equipment, not a rule.
How a Move Runs
Process
A relocation runs in a fixed order because each step depends on what the one before it found. Nothing comes down until the receiving building has been walked, drawn, and permitted.
Project We Have Moved and Removed
Proof
Two million pounds of racking, out and recycled · Georgia distribution facility.
A storage rack system more than 20 years old and past its useful life. Twelve of our crew, working with fork trucks, scissor lifts and cutting tools, took down the entire structure. More than 60 truckloads went to recycling.
Frequently Asked Questions
FAQs
Can you move equipment we did not buy from you?
Yes. Relocation is about the equipment you already own. We identify the manufacturer and series first, so we know what can be reused and what has to be replaced.
Do we need a permit in the new building?
Usually, for racking above the local height threshold, mezzanines and lifts. The permit follows the building, not the equipment. See permitting.
Can you change the layout while you move it?
Yes, and it is usually the right time to. The new layout is drawn before anything comes down.