Rack, Mezzanine and In-Plant Permitting in Georgia
Pulled and Inspected in Georgia.
Let Us Pull the Permit
What We Prepare
Our scope
- Layout drawings in AutoCAD, showing the system against the column grid, aisles, exits and sprinkler heads
- Structural drawings and calculations, stamped by a licensed professional engineer
- Rack and storage plans for the fire marshal: storage areas, heights, commodity, aisle widths and flue spaces, with your commodity information
- The permit application and its submittal
- Responses to plan review comments
- Inspection scheduling, and our crew on site for the inspection
Who Issues What in Georgia
The short version
Georgia sets the minimum building and fire codes statewide, but it leaves most permits to the city or county where your building sits. That is why two plants an hour apart can get different answers on the same rack. The exception is vertical reciprocating conveyors (VRCs), which the State of Georgia permits and tests directly.
What Counts as High-Piled Storage
The fire code trigger
Under the International Fire Code, which Georgia adopts as its state fire code, high-piled combustible
storage means combustible materials in closely packed piles, or on pallets, in racks or on shelves, where
the top of storage is more than 12 feet high. For high-hazard commodities, such as expanded plastics
and rubber tires, the threshold is 6 feet.
Once storage crosses that line, the fire code starts asking about your building:
How the Permit Fits the Schedule
Sequence
- 1. Site walk. We identify which permits apply.
- 2. Drawings. Layout, then stamped structural drawings.
- 3. Submittal. We submit the permit application.
- 4. Plan review. Comments answered, drawings revised if needed.
- 5. Permit issued. Fabrication and delivery timed to it.
- 6. Install and inspect. Inspections during and after installation, then final approval.
Frequently Asked Questions
FAQs
Do you handle the permit and inspection?
Our installations include the permit and the inspection, from the drawings and the permit application to responses to plan review comments and our crew on site for the inspection.
What if our existing racking was never permitted?
Call us and we will review your existing racking with you. We handle the drawings, calculations and permits for the rack projects we install.
How long does a permit take?
It depends on the jurisdiction and on whether the fire marshal is involved. We give an expected timeline in the proposal.
Does Georgia require a permit for high-piled storage?
Georgia adopts the International Fire Code but leaves permit requirements to local jurisdictions. Many require a permit once high-piled storage covers more than 500 square feet.
Tell Us What You Are Adding
Start a project
The system, the building's city or county, and the height of the storage. We will tell you which permits apply.