Modular Offices and Locker Room for a Fortune 500 Consumer Products Plant
Finished in Under Two Weeks.
Offices Beside the Line?
What We Installed
A PortaFab modular office system with:
- Four private offices
- A conference room with an overhead projector
- A locker room for employees
- Cat5 data drops
- Sound insulation in the walls
How the Project Came Together
From Challenge to Solution
See how each project came together, from the initial need and installation process to the finished result.
The Problem
The company needed space for several employees quickly. The only location available was next to the manufacturing area, and construction could not disrupt production.
How It Went In
We made several site visits before finalizing the layout, then gave the customer an engineered PortaFab drawing. Once work started, the whole project took less than two weeks. Because the system is modular, there was no disruption to the production line.
The Result
The offices, the conference room and the locker room were finished in less than two weeks, beside a production line that kept running.