13,000 Sq Ft Modular Assembly Building for a Georgia Manufacturer

Panels, Ductwork and Epoxy Floor.

Major manufacturing facility · Georgia · PortaFab modular building · 13,000 sq ft · Two 40- ton rooftop HVAC units · Stonhard epoxy floor

Need a Room This Big?

Interior of a large industrial space with glossy green epoxy flooring and white walls.

What We Installed

We designed and built a 13,000 square foot modular building for the plant, then carried the rest of the scope:

  • Two 40-ton rooftop air conditioning units and all of the ductwork
  • A Stonhard epoxy flooring system to finish the space

How the Project Came Together

From Challenge to Solution

See how each project came together, from the initial need and installation process to the finished result.

The Problem

A major manufacturing facility needed a 13,000 sqare foot assembly space inside the plant, with its own air conditioning and a finished floor.

How It Went In

We chose a pre-engineered modular building because it can be expanded, relocated and reused as the plant's needs change, and it is tougher than drywall construction. The rooftop AC, the ductwork and the epoxy floor were installed as part of the same job.

The Result

While we were on site, the customer hired us for several more construction and material handling projects.

Systems Used on This Project

Need a Large Room Inside the Plant?

Send us the footprint and what happens inside it. We will scope the building, the HVAC and the floor together.